
Teva Pharmaceutical Industries
The project was executed in a working plant at full production and capacity.
- Stainless steel piping
Steam system installation
Combe executed the following work within this project:
Services
Supply and installation of gas piping systems: oxygen, nitrogen, breathing air, helium (stainless steel piping).
Sanitation
Fire Protection
Sanitation, sewage and drainage, steam system, sprinklers system, treated water, heated and chilled water.
The work on the site was carried out under constant pressing schedule requirements, during non-routine working ours, all in order to bring the project to completion in an efficient and timely manner, while maintaining high quality standards.
Special equipment and craftsmanship tools: scaffolding, ladders.
Who We Are
Safety highlights: “Living Plant” environment. Execution of the labor was performed alongside with the plant’s ongoing production. Risk assessment and management was implemented to ensure that connectivity to existing pipelines was at all times coordinated and authorized in writing to suit all the existing plant equipment.
“In a hundred years from now, I want anyone looking at a piping system installed by Combe to know that top-level professionals were here” - Hubert Combe in his many visits at the company’s project sites.
Execution at high altitudes: steam system pipelines were lifted using cranes and installed on top of the plant roof.
Our reputation of unrivalled quality and safety is obligating. Read more >
A complex project on the table?
A century of engineering, management and execution of complex projects.
